132kV Nusajaya Technology Park Switching Station (GIS)
In March 2014, MDSB was awarded a contract by TNB for the supply, erection, testing, and commissioning of the new PMU 132kV Nusajaya Technology Park Switching Station (GIS) in Johor, complete with relevant protection, cabling, and all associated civil works as outlined in this project.
Compact Substation Unit (CSU) 11/0.433kV 500kVA Genset
Earthing system
Reconfiguration of 1 circuit of 132kV UGC FCTR-GDSD
1 circuit of 132kV UGC FCTR – GWDC
1 circuit of 132kV UGC GDSD - GWDC into PMU NJTP
Installation of new Control Panel, Relay Panel, DCDB Panel, Busbar Protection Panel, and all related secondary work
Construction of a new substation building and associated civil works such as access roads, gantries, and other miscellaneous and common work items
The project is estimated to be completed within two years and commissioned in August 2025.
MALAYSIA | SELANGOR
33kV PPU Bukit Raja (Prince Court, Petronas Hospital)
In March 2014, MDSB was awarded a contract by TNB for the supply, installation, and commissioning of 33kV GIS and 11kV switchgear, along with ancillary equipment for the Distribution Main Intake Substation in the Northern and Central Regions, Mainhead "A," at the following locations: PPU Royal Cendana, PPU Taman Segar 2, PPU USJ 4, and SSU Hospital Petronas.
The project is estimated to be completed within two years and commissioned by 2002.
MALAYSIA | BANTING, SELANGOR
275kV PMU Olak Lampit Extension
MDSB was awarded a contract by TNB for the supply, erection, and commissioning of 275kV switchgears, ancillary equipment, and associated civil works for the extension of the 275kV Olak Lampit Substation.
Project Scope:
The Olak Lampit Extension 275kV Substation project encompassed comprehensive civil and electrical works aimed at enhancing the substation's capacity and functionality.
Key Project Highlights:
Supply, erection, and commissioning of 275kV switchgears
Installation of ancillary equipment
Execution of all associated civil works
This project was successfully completed within two years and commissioned in 2004.
MALAYSIA | KENINGAU, SABAH
Keningau Main Intake Substation
MDSB was awarded a tender for upgrading works at the Keningau Main Intake Substation in collaboration with Sabah Electricity Sdn Bhd.
The project was successfully completed within one and a half years. It was commissioned in 2000.
MALAYSIA | SELANGOR-PERAK-NEGERI SEMBILAN
275kV and 132kV Class 0.2 Current and Voltage Transformers
MDSB has been awarded by TNB the tender for Supply and Installation of 275kV and 132kV Class 0.2 Current and Voltage Transformers for Mainhead C and D.
The general scope of work includes the supply and installation of transformers at the following locations:
CBPS
Paka Power Station
Port Dickson Power Station
Gelugor Power Station
Cenderoh Power Station
Sg. Piah Upper Power Station
Sg. Piah Lower Power Station
This project was successfully completed within two years and commissioned in 1999.
MALAYSIA | KLANG, SELANGOR
132/33/11kV PMU Pandamaran
MDSB has been awarded by TNB, tender for 132kV and 11kV Transformer Bays and Associated Equipment.
The general scope of work includes:
132/11kV 30MVA Transformer Bay (T1):
Current Transformer
Circuit Breaker
Busbar Isolator
Related Control/Relay Panels
Busbar Protection Panel
132kV Underground Cable (Spare) Bay:
Current Transformer
Circuit Breaker
Busbar Isolator
Related Control/Relay Panels
132kV Underground Cable Bay (Converted to OHL Bay for Tee-Off CBPS-PIDH):
Surge Arrester
Circuit Breaker
Capacitive Voltage Transformer
Disconnector (Line and Busbar)
Earth Switch
Related Control/Relay Panels
Two 132kV Transformer Bays:
Current Transformer
Circuit Breaker
Capacitive Voltage Transformer
Surge Arrester
Busbar Isolator
Related Control/Relay Panels
132kV Bus Coupler Bay:
Circuit Breaker
Current Transformer
Busbar Isolator
Related Control/Relay Panels
Busbar Protection Panel
Substation Building, M&E, Associated Civil Works:
Testing and Commissioning
11kV Switchgear:
Master Control Panels
NER
Additional 132/11kV 30MVA Transformer Bay (T2):
Current Transformer
Circuit Breaker
Busbar Isolator
Related Control/Relay Panels
Another 132kV Underground Cable (Spare) Bay:
Current Transformer
Circuit Breaker
Busbar Isolator
Related Control/Relay Panels
The project is estimated to be completed within two years and commissioned by March 2003.